2005 年 11 巻 22 号 p. 25-28
It is necessary to examine the foundation, the T type wall, the corner wall, the brick beam, and the connection of floor and interior materials to actually construct it by the SRB-DUP method. In this .study, it was examined that the construction technique and detail of the SRB-DUP brick house to actually construct it. The conclusions are as follows. It was clarified to the SRB-DUP method that an original management technique that was to set up the anchor bolt in the foundation, placed the self leveling, and managed vertical accuracy of the brick wall by using leveling string at the bolt position etc. was necessary.