日本建築学会技術報告集
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
ディスポーザ排水システムの配管設計負荷と維持管理(環境工学)
南 裕介大塚 雅之南陽 聖継小島 誠造
著者情報
ジャーナル フリー

2005 年 11 巻 22 号 p. 329-333

詳細
抄録
This paper described the drainage load of food waste grinder drainage system, and maintenance. The following are the two objectives of this study. (1) First of all, to measuring an average flow rate of sanitary fixture (qd-value) for designing a food waste grinder drainage system, and compare with previous reference value and standard of SHASE-S206. And to clarify drainage load calculation method for the design of food waste grinder drainage system. (2) To examine how the drainage with grinded food waste flows to lower stories of the building, as the important issue of maintenance management.
著者関連情報
© 2005 日本建築学会
前の記事 次の記事
feedback
Top