2006 Volume 12 Issue 23 Pages 127-130
For a steel structural building with long span, for instance supermarkets and warehouses, the method jointing the bottom of steel tube column and the top of the precast reinforced concrete pile and having no spread footing and no tie beam is economical and a reasonable structure. This Paper introduces the jointing method, which was developed by authors, and presents also the results of the laterally loading tests on the joint parts to investigate its structural ability.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)