2006 Volume 12 Issue 24 Pages 177-182
According to the result of seismic capacity evaluation of Aichi prefectural office building, the seismic capacity of the building is judged to be insufficient. To improve the seismic capacity of the building, Project team was formed. This report is summary of a study for the best choice of seismic retrofit method for Aichi prefectural office building by the project team.
Ethical standards of the publisher (‘Ethical Standards Concerning the Peer Review for the Presentation of Architectural Transactions and Works’)