2014 年 20 巻 46 号 p. 855-860
Until now, demolition work has been upgraded about technical matters and qualification system. However, actual state of demolition work from Engineer and skilled worker’s standpoint has not been fully elucidated. Therefore, the purpose of this study is to investigate the actual state of demolition work by the questionnaire survey targeted to subcontractors. As a result, this paper showed the actual state of demolition work about preliminary survey, calculation, consciousness of accepting order and contract system, construction scheme, construction control and human materials.