抄録
In this study, two kinds of experiments were performed to clarify the appropriate construction method of foot protection part of the tip of pile. From the first experiment, it was found that infusion of the cement milk in the lower part of the model pile was very important. From the second experiment, it was shown that the increase of the quantity of infusion of the foot protection part was very effective.