AIJ Journal of Technology and Design
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
History and Theory of Architecture
RENOVATION WORK CARRIED OUT ON THE KIRIHURU CHURCH IN 1906
Nobuyo KITAHisao HABUKA
Author information
JOURNAL FREE ACCESS

2015 Volume 21 Issue 49 Pages 1273-1278

Details
Abstract

The Kirifuru Church renovation carried out by Yosuke Tetsukawa’s company immediately after its foundation consisted of repairing the church’s rib vault ceiling, restoring the bell tower, adding a second floor to the upper part of the entrance, and restoring the external brick wall. The work lasted from January to November 1906. The workers were Tetsukawa’s team, woodworkers, brick-layers, and plasterers, and the work schedule was compiled with reference to their tasks.

Content from these authors
© 2015 Architectural Institute of Japan
Previous article Next article
feedback
Top