2021 Volume 27 Issue 66 Pages 1021-1026
This research investigates elements of uncertainty (EOU) remaining after demolition work starts, through observation of the design and construction processes of an exclusively-owned dwelling unit of a condominium with a design–bid–build method. Design revision was assumed for designers to deal with EOU as of the construction contract. There was a case where EOU found after the demolition of interior brought design revision and additional construction, which influenced the construction period and cost. It is thinkable that issues caused by EOU found during the construction work increase. A contract needs to be thought for such risks among stakeholders.