日本建築学会技術報告集
Online ISSN : 1881-8188
Print ISSN : 1341-9463
ISSN-L : 1341-9463
建築計画
建築確認申請手数料の成立過程
三宅 博史藤賀 雅人
著者情報
ジャーナル フリー

2021 年 27 巻 66 号 p. 883-886

詳細
抄録

This paper studied the enacting process of the Application fee for Building confirmation. Conclusion of this study is as follows; 1) In the process of enacting the Building Standards Law, the maximum amount and the maximum amount above a certain scale were added to the article after the legal examination. 2) In the process of enacting the Enforcement Order, detailed provisions were established with eight levels of area classification. 3) In order to make the maximum upper limit equal to the conventional amount, the area scale of the corresponding category was set too small as a standard for the future.

著者関連情報
© 2021, 日本建築学会
前の記事 次の記事
feedback
Top