2021 年 27 巻 67 号 p. 1470-1475
This study aims to evaluate the effect of the redevelopment of green roads and understand the residents’ needs. We conducted an observation survey at “Seseragi Park” at the time before the maintenance (July-September 2019) and after the maintenance (July-October 2020). Pedestrians tended to have dispersed traffic zones due to the widening of the garden road. However, the effect of setting up a “recommended route” for bicycles was low in the survey points. As a result of analysis with questioner survey on the entire GMS, we clarify a gap between the section with high utilization intensity.