Abstract
The construction of a waste treatment facility is difficult because we can’t reach the inhabitant consensus. In this study, we have investigated the condition for the inhabitant consensus on the construction of the waste treatment facility. As a result, it became clear that the energy supply from the facility is the most effective to the consensus building on the construction of the waste treatment facility. Inhabitants are hoping for the supply of energy which is equivalent to half of the monthly expenses for heating and lighting. The electricity generated at the waste treatment facility is equivalent to 42.5% of energy consumption of whole households in the subject area and we consider that the energy supply can make it possible to gain the inhabitant consensus on construction of the waste treatment facility.