Abstract
Although it usually constructed the Shimoji coating plastering materials, by the time construction of plastering materials became a process of the following glazing material including construction of the Shimoji coating plastering materials and drying time, three day in between was required for it at least. When a cold district and temperature were low, when humid, still longer care-of-health time was required. Furthermore, it dried after construction of glazing material, and by the time it started to use, three days were further needed. Therefore, by the repair work, since this time was not able to be taken, also when adoption of inorganic plasterer finish material was not completed, it was. Moreover, in the case of plywood or a concrete bed, the ground needed to construct the float inhibitor and water absorption inhibitor of the stain from a ground. This time, the wallpaper of the permeability which can replace the Shimoji coating material was constructed as a ground, and plastering materials were constructed.