抄録
To determine the suppliable electric power by performing a demand response operation, which replaces the heat source chilled water heat load of building with a multiple heat source system, demand response operation simulations were conducted by using an existing multiple heat source system. As a result, it was found that the heat source chilled water heat load can be replaced by adjusting the amount of flowrate of heat source pumps, and electric power could be contributed.