The Bulletin of National Institute of Technology, Hiroshima College
Online ISSN : 2434-494X
Print ISSN : 1883-9908
The improvement of the evaluation method of the Risk-Based Maintenance for Hiroshima-Maru
Kouji SEIDAToshifumi CHAENKazuhiro OUCHIAtsuhiro YABUGAMIKenji YAMADANoriko UCHIYAMAGo KOBAYASHIYoshiaki KAWAMURAKimio TATSUMIDaisuke KOBAYASHIMasashi OHIRAKatsuki SHIBATA
Author information
RESEARCH REPORT / TECHNICAL REPORT FREE ACCESS

2017 Volume 39 Pages 31-34

Details
Abstract

Risk-based maintenance (RBM) means that maintenance will be done according to the risk evaluation result, which is calculated by the probability of failure and the consequence of failure. RBM is often applied to some plants (oil refining plant, chemical plant etc...), but still few applied to vessels. IMC developed the RBM software for vessels in order to apply RBM to ship management, but the RBM calculation method and result is not enough to be verified. Therefore, we apply RBM to Hiroshima-Maru, and improve the RBM calculation method and result. In the future, we aim at the practical use of the RBM for vessels.

Content from these authors
© 2017 National Institute of Technology, Hiroshima College
Previous article Next article
feedback
Top