抄録
In our country, the peak demand load is increasing and the load factor of utility is decreasing year after year. However constructing the new power plant is not easy from the restrictions in respect of environment. Consequently operation of electric power systems is becoming more difficult. In order to solve this problem, introducing the LLS using photovoltaic (PV) power generation system or battery (BT) storage system is examined by the utility side. Since neither PV nor BT has the restrictions in respect of environment, it can be installed also in a city area. On the other hand, since a contract electric power can be reduced, introducing the LLS is advantageous also for a customer. However the system, characteristics and effect of LLS is not clear.
This paper deals with the operational benefit of LLS with solar cell and storage battery from customer side. The following became clear from the simulation results. 1) If the price of battery system reaches a target price, introducing the LLS becomes advantageous than introducing the PV system. 2) There is the best LLS corresponding to the electric power contract. 3) The operational benefit changes with the capacity of PV and BT.