電気学会論文誌B(電力・エネルギー部門誌)
Online ISSN : 1348-8147
Print ISSN : 0385-4213
ISSN-L : 0385-4213
特集論文
並列バンクに関する制約を考慮した最適潮流計算
河合 一郎多田 泰之
著者情報
ジャーナル フリー

2005 年 125 巻 12 号 p. 1203-1207

詳細
抄録

This paper proposes parallel connected transformers operation constrained optimal power flow. Usually, taps of parallel connected transformers are adjusted to be the same ratio to reduce transformers' load losses. Moreover, shunt capacitors and shunt reactors connected with parallel connected transformers are not used at the same time. It's supposed that increase of constraint on optimal power flow causes computing probrem, for example increasing time for computing, so the constraint about parallel connected transformers are not considered in the conventional optimal power flow. When an objective function much related to reactive power compensation is applied to the conventional optimal power flow, we can get a suitable solution for power system operation. However when an objective function not related to reactive power compensation is applied to the conventional optimal power flow, we cannot get suitable solution. The proposed method adjusts tap ratio of transformers and phase shifting equipment (power capacitor and shunt reactor) to be suitable for power system operation whatever objective function is applied. In addition, the proposed method can reduce the calcurate time.

著者関連情報
© 電気学会 2005
前の記事 次の記事
feedback
Top