抄録
This paper proposes a new framework of distribution system planning under the condition of mass installed Distributed Generators (DGs). At present, distribution system planners do not pay much attention to the interconnection of DGs. However, if some DGs can supply power instead of conventional power stations, they will give a significant impact. The planners will have a new option to build a network system plan without unnecessary investment to distribution networks. In this study, an objective function for distribution system planning is formulated to obtain maximum profits for utilities, and the authors discuss reduction of the utilities' investment cost and distribution system loss for installation of DGs. In addition, the authors propose a solution method using a genetic algorithm technique in order to find quasi-optimal solutions for large scale problems. Furthermore, the authors also discuss the connection tariff in order to increase the utilization rate of distribution networks. The advantage of the proposed method is demonstrated through several numerical simulations with successful results.