Journal of Asian Architecture and Building Engineering
Online ISSN : 1347-2852
Print ISSN : 1346-7581
Architectural Urban Planning and Design
New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities
Kang NamukSon JaehoLee Seunghyun
著者情報
ジャーナル フリー

2015 年 14 巻 2 号 p. 379-386

詳細
抄録
Many studies related to discrete Time-Cost Trade-Off models have been conducted with the goal of optimizing the total construction cost. However, since the existing discrete Time-Cost Trade-Off models do not consider the sequence of the alternatives between activities, there are limitations concerning their practical applicability. Thus, this research develops a new Time-Cost Trade-Off model that considers the sequence of alternatives between activities. In addition, all of the possible relationships (FS, FF, SS, and SF) between activities are considered in the model to enhance its practicability. This new Time-Cost Trade-Off model is expected to make initial planning as efficient as possible.
著者関連情報

この記事は最新の被引用情報を取得できません。

© 2015 Architectural Institute of Japan
前の記事 次の記事
feedback
Top