Journal of Advanced Mechanical Design, Systems, and Manufacturing
Online ISSN : 1881-3054
ISSN-L : 1881-3054
Papers(Special Issue)
Reactive project scheduling method to enhance project progress under uncertainty
Haruhiko SUWADaisuke MORITA
Author information
JOURNAL FREE ACCESS

2016 Volume 10 Issue 3 Pages JAMDSM0051

Details
Abstract

This study proposes a new method for reactive project scheduling that enhances a smooth progress of a project, which is referred to as a “degree of project progress (DPP).” The proposed method generates a so called revision plan for the rest of a current project baseline schedule at each inspection point in time based on a project delay which can be obtained from the deviation between the planned and actual starting times of activities. Revision planning indicates a series of decisions whether an existing baseline schedule should be revised or not. Then the project goes on in accordance with the revision plan. Numerical experiment derives the effectiveness of the proposed method and demonstrates the applicability of our method as an efficient reactive schedule revision in project time management.

Content from these authors
© 2016 by The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top