計画行政
Online ISSN : 2189-3667
Print ISSN : 0387-2513
ISSN-L : 0387-2513
研究論文
風力発電事業の事業段階における紛争解決要因の実証分析
畦地 啓太錦澤 滋雄原科 幸彦
著者情報
ジャーナル フリー

2014 年 37 巻 1 号 p. 54-64

詳細
抄録

Environmental conflicts arising from concerns of local residents and environmental protection groups pose a significant barrier to the further development of wind farms in Japan, as in other countries. There has been increasing discussion about countermeasures to address the concerns and ease conflicts. In order to design a smooth and adequate planning system of wind farm developments, this study aims to demonstrate factors that determine the success and failure of conflict resolution at the project stage. To do so, this study focuses on public participation at the project stage, and analyzes its function in light of the site-specific difficulties determined by the characteristics of the project. Through eight in-depth case studies, the results demonstrate that the projects with a high level of site-specific difficulties are much more likely to be unsuccessful regardless of the levels of public participation; therefore it indicates the limitation of practice to ease conflicts at the project stage. Barriers discovered to hinder developments include “designated areas regulated by the Natural Parks Act” and “the disclosed 10km grid habitat for Golden Eagle.” On the other hand, the projects with a low level of site-specific difficulties are more likely to be successful with a high level of public participation at the project stage.

著者関連情報
© 2014 一般社団法人 日本計画行政学会
前の記事 次の記事
feedback
Top