It was concluded that hydrocarbon flow occurred through the 7″×9-7/8″production casing from the shoe track. A combination of casing design (long-strings or liner), cementing program, temporary abandonment plan, failure of function of float collar, contamination / channeling of cement were possible causes of hydrocarbon flow. A mitigation plan to prevent blowout is proposed and discussed in this paper.