Zairyo-to-Kankyo
Online ISSN : 1881-9664
Print ISSN : 0917-0480
ISSN-L : 0917-0480
Rapid Communication Note 2011
A Construction Case of Galvanic Anode Systems Using Aluminum Panel Anodes Applied to The Concrete Highway Bridge
Kazuhiro TanakaTakashi Iwasaki
Author information
JOURNAL FREE ACCESS

2011 Volume 60 Issue 12 Pages 528-531

Details
Abstract

On the cathodic protection system for concrete structure, a galvanic anode system is recently highlighted as maintenance-free system. But, only some reports on the periodic or continuous monitoring of its performance can be found. The report covers the continuous monitoring of the performance on our galvanic anode system with “aluminum panel anodes”, applied to the concrete highway bridge. The external view on the bridge was kept in initial condition for eight months after application. Although more positive ON potential of the rebar and lower output current of anode per unit rebar surface area were observed at lower ambient temperature, the rebar potential was kept in sufficient protection level.

Content from these authors
© 2011 Japan Society of Corrosion Engineering
Previous article Next article
feedback
Top