Journal of Disaster Research
Online ISSN : 1883-8030
Print ISSN : 1881-2473
ISSN-L : 1881-2473
Special Issue on Expectations for Upgrading Dams Under Operation
Quantification of the Risks on Dam Preliminary Release Based on Ensemble Rainfall Forecasts and Determination of Operation
Hironori InomataMasaki KawasakiShun Kudo
著者情報
ジャーナル オープンアクセス

2018 年 13 巻 4 号 p. 637-649

詳細
抄録

Preliminary release conducted at multipurpose dams is the operation which aims to temporarily increase their flood control capacity by releasing water stored for water utilization ahead of a flood based on rainfall forecasts. However, if rainfall forecasts overestimate actual rainfall, there is a risk that the volume needed for water utilization may not fully recover after preliminary release. Consequently, because of apprehension of such a risk, preliminary release has been seldom operated in Japan. This paper introduces the determination of preliminary release based on ensemble rainfall forecasts. First, the two risks related to preliminary release were defined at first. One is the flood control operation for extreme floods, which is conducted when preliminary release has not been conducted or inadequately conducted, whereas the other is the water level may not fully recover to the level needed for water utilization if preliminary release is decided based on rainfall forecasts overestimating actual rainfall. Next, these two risks were quantified using the results from ensemble rainfall forecasting and hydrological simulation. Finally, based on the quantified risks, the operation of preliminary release was decided. The experimental simulation of preliminary release based on ensemble rainfall forecasts was conducted. The flood caused by Typhoon Man-yi in 2013 is selected as the experimental flood, and the Hiyoshi Dam as the experimental dam, where the flood control operation for extreme floods was conducted during the flood. The simulation results of the experimental flood showed that flood control operation for extreme floods would still be required notwithstanding the increased flood control capacity generated by preliminary release. However, the results also showed the possibility that preliminary release can delay flood control operation for extreme floods and considerably reduce the maximum outflow compared with the maximum outflow that would be required when no preliminary release is conducted. In addition, the study found that ensemble rainfall forecasting can be an effective tool to support the formation of a consensus among stakeholders such as dam managers and water users by quantifying and visualizing the risks associated with preliminary release, which cannot be accomplished with the conventional deterministic rainfall forecasting.

著者関連情報

この記事は最新の被引用情報を取得できません。

© 2018 Fuji Technology Press Ltd.

This article is licensed under a Creative Commons [Attribution-NoDerivatives 4.0 International] license (https://creativecommons.org/licenses/by-nd/4.0/).
The journal is fully Open Access under Creative Commons licenses and all articles are free to access at JDR Official Site.
https://www.fujipress.jp/jdr/dr-about/
前の記事 次の記事
feedback
Top