主催: 社団法人 日本エネルギー学会
後援: 独立行政法人 新エネルギー・産業技術総合開発機構
会議名: 第18回日本エネルギー学会大会
開催地: 札幌コンベンションセンター
開催日: 2009/07/30 - 2009/07/31
The methane fermentation plant (1 t/day scale) was placed at MYCAL AKASHI, as a model case of methane fermentation of waste food at the urban shopping center. The features of this plant are as follows. (1)Pretreatment : aerobic solubilization by lactic fermentation. (2)Methane fermentation : EGSB, UASB systems by using methanogenic granules. (3)Electrical generation : The biogas generation in this situation is the first case in Japan. The Details of this project are described as follows.