INFRASTRUCTURE PLANNING REVIEW
Online ISSN : 1884-8303
Print ISSN : 0913-4034
ISSN-L : 0913-4034
Measurement of Discount Ratio Based on Difference between Annual WTP and Life WTP
Akihiro YAMADAEiji OHNO
Author information
JOURNAL FREE ACCESS

2007 Volume 24 Pages 149-156

Details
Abstract
This study paid attention to the difference of WTP (Willingness to Pay) by the difference of payment unit in CVM (Contingent Valuation Method), and measured the discount ratio which was based on difference between the Annual WTP and the Life WTP, by applying the discount function which was discussed well in behavioral economics as psychological approach. Then, we discussed the time preference of people and the validity of current discount ratio (4% annually) which is being used in evaluation of public works in Japan. This result pointed out the problem that the current discount ratio may have the possibility of over-estimation and/or under-estimation of total benefit which depend on conditions.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top