既設トンネルを用いた事前地質調査の適切度について
中川 浩二保岡 哲治三木 茂藤本 睦北村 晴夫
著者情報
ジャーナル フリー

2002 年 12 巻 p. 159-164

詳細
抄録
The purpose of this study was to clarify the disagreement of the classifications of ground from preliminary geological investigation stage and that from construction stage. This study was concentrated on 1) was the ground evaluation correctly did, and 2) was the investigation quantity reasonable, based on the results of re-investigation of three existing tunnels.
To increase the objectivity of the results, the investigations were down by several geologicalengineers based on the requirements close to preliminary geological investigation on the same tunnel. Asa result, it was found that for different geographical and geological conditions, different conclusions were obtained.
著者関連情報