レイズボーリング工法による世界最大クラスの斜坑掘削
小野 武美大野 雅之村上 荘二高塚 正彦南條 忠文
著者情報
ジャーナル フリー

1997 年 7 巻 p. 207-212

詳細
抄録
We applied Raise Boring Method for inclined shaft which is 434m-diameter, 340m-long and 70degrees inclined in Bukou mine. It was first time that RHINO 2006DC, large raise boring machine made by Tamrock Finland, was used in Japan and this is the world's largest class raise boring project in inclined shafts,
We have broken through it with only 0.5% error in spite of some troubles that was caused by geological condition, very cracked limestone, We have overcome these troubles by some new technologies, for example memory type direction and inclination measurement system, excavation management system, solid stabilizer and so on.
This experience suggest us a spread of possibility of Raise Boring Method.