シラス地山におけるトンネル掘削のための地下水低下工法の解析的検討
稲葉 秀雄鈴木 雅行多宝 徹
著者情報
ジャーナル フリー

1999 年 9 巻 p. 107-112

詳細
抄録

A tunnel which has been constructed in “Shirasu”, met with impervious layer at 260 meter from entrance. We observed groundwater level 20 meter higher than spring line in opposite side of the that layer, and we needed more than one month to drawdown. Therefore we conducted a drawdown simulation with finite element method to understand an effective dewatering method.
The results of simulation are as follows:(1) It's effective on drawdown to use longer drainage borings togetherwell point drainage.(2) The specific storage of Shirasu is about 0.03l/m, and it's very important factor in this case.