PROCEEDINGS OF TUNNEL ENGINEERING, JSCE
Online ISSN : 1884-9091
ISSN-L : 1345-0832
FIELD MEASUREMENT OF THE LINING WITH 4-CENTERD SHIELD METHOD
Hiroki ONOYukinori KOYAMAMasataka NISHIOKoji KAYUKAWA
Author information
JOURNAL FREE ACCESS

1999 Volume 9 Pages 301-306

Details
Abstract

Roppongi station in Metropolitan Subway Route No.12 was constructed as vertical twin tunnels. The lining structure used this shield method is formed out of specific segments. We executed the field measurement concerning the lining structure. In this measurement, we chiefly paid attention to grasp the following, 1, earth pressure for the lining structure. 2, influence of the lower tunnel on the upper shield excavation. 3, influence on lining structure when the temporary pillars were removed. As a result of the measurement, it was confirmed that this lining structure was safe concerning the behavior. In this paper, the result of the field measurement was described.

Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top