土木学会論文集B1(水工学)
Online ISSN : 2185-467X
ISSN-L : 2185-467X
水工学論文集第56巻
Prediction of Dam Construction Impacts on Annual and Peak Flow Rates in Kase River Basin
Cindy SUPIT浩一郎 大串
著者情報
ジャーナル フリー

2012 年 68 巻 4 号 p. I_121-I_126

詳細
抄録
The SWAT model has been used to estimate the impact of dam constructions on annual and peak stream flow rates in Kase River, Japan. A new multipurpose dam, Kase River dam has been constructed just downstream of another old agricultural dam, Hokuzam dam. The watershed area is set up 197.735 km2 that accounts for 54% of the entire area of the Kase River Basin. The model was calibrated and validated for stream discharge data from 2008-2009 by using Nash-Sutcliffe to model performed evaluation. Simulated data from the model for the period 2008 - 2009 were used in order to investigate the response of stream flow to dam constructions in Kase River basin. Using sensitivity analysis dominant parameters affecting water flow, the four most sensitive parameters of flow were selected and adjusted. The best fit was achieved with R2 = 0.86 and NSI= 0.84 at Furuyu outlet just downstream after the new dam. The result from the scenarios analysis shows that an annual runoff decreases consistently from the disappearance of dam by the value of 1.40-11.59 m3/s to 0.83-8.89 m3/s and 1.18-11.35 m3/s respectively during appearance of Hokuzam dam only and appearance of Hokuzam and Kase dam in the watershed. Since both dams' impoundments, peak flow rates at Furuyu have decreased by 23.45% from current condition. The results of this study enhance the understanding of stream flow consequences of dam constructions associated with impoundment, while these estimates could aid a decision maker to optimize water supply and demand and further water quality management in this basin.
著者関連情報
© 2012 Japan Society of Civil Engineers
前の記事 次の記事
feedback
Top