土木学会論文集B1(水工学)
Online ISSN : 2185-467X
ISSN-L : 2185-467X
水工学論文集第57巻
カスケード方式に基づく流水型ダム群の洪水制御効果に関する実験的研究
三戸 佑夏押川 英夫小松 利光
著者情報
ジャーナル フリー

2013 年 69 巻 4 号 p. I_1639-I_1644

詳細
抄録
The new flood control method called as 'Cascade method' permitting a dam to overflow from an emergency spillway around an upstream region with plural dry dams set in series in a river basin was confirmed by the experiment with a model. In addition, it also became clear that the shape of a flood hydrograph into a most upstream dam reservoir influences effects of the Cascade method greatly. Furthermore, the flood control capability of another new type of a dry dam to encourage water-utilization was also clarified. The new type has an outlet work for flood control with a slide gate which can be closed automatically depending on hydraulic pressure or buoyancy. The physical experiment demonstrated that the new type of dry dams constructed in series with such a gate strengthens not only functions for irrigation but also a flood control capability of the Cascade method.
著者関連情報
© 2013 公益社団法人 土木学会
前の記事 次の記事
feedback
Top