土木学会論文集B1(水工学)
Online ISSN : 2185-467X
ISSN-L : 2185-467X
水工学論文集第60巻
洪水調節とポンプ排水を考慮した外水処理モデルの六角川流域への適用
秋山 壽一郎白石 清隆重枝 未玲坂田 治義
著者情報
ジャーナル フリー

2016 年 72 巻 4 号 p. I_1249-I_1254

詳細
抄録

 A retarding basin is one of the most effective countermeasures to mitigate existing downstream flooding problems. Effectiveness of the basin is strongly dependent on design of an overflow levee. Experimental works have been commonly employed for the overflow levee design. The primary objective of this study is to demonstrate that a numerical model, which are comprised of the distributed hydrological model, the 2D unsteady flow model based on flux-difference splitting scheme as well as unstructured finite-volume method, and operation of drainage system, is an effective tool to evaluate the stage-discharge relationship of the Mutabe retarding basin in the Rokkaku River under the given conditions of rain-fall and tidal level of the Ariake Sea.

著者関連情報
© 2016 公益社団法人 土木学会
前の記事 次の記事
feedback
Top