2020 Volume 75 Issue 6 Pages I_675-I_682
In this research, when setting up a two-stage crossing facility with no signal in a basic road section, in order to clarify the traffic volume of the road where the smoothness is not lost, various basic road conditions 1 cases set in advance are used. By carrying out traffic flow simulation with traffic volume patterns, it was calculated how much delay time would occur by installing a two-stage crossing facility. In addition, we calculated the delay time under various traffic conditions, and summarized the traffic conditions that affect the delay time and their degree. As a result, the general delay time that may occur on the road where the no-signal two-stage crossing facility is revealed. Additionally, the influence and extent of the traffic conditions such as vehicle speed, large-sized vehicles and vehicle group formation on delay time are clarified.