Journal of Japan Society of Civil Engineers, Ser. D3 (Infrastructure Planning and Management)
Online ISSN : 2185-6540
ISSN-L : 2185-6540
Infrastructure Planning and Management Vol.38 (Special Issue)
SPEEDING UP OF PRODUCING INITIAL MICRO DATA OF HOUSEHOLDS IN HOUSEHOLD BASED ESTIMATION
Tomohiko SAKATAAtsushi SUZUKINao SIGIKIToshiyuki MASAKIHiroyuki DEN
Author information
JOURNAL FREE ACCESS

2021 Volume 76 Issue 5 Pages I_425-I_435

Details
Abstract

The purpose of this study is to propose an estimation method of initial micro data which greatly shortens the calculation time of error correction and enables more accurate estimation than the method of Tsuru et al. (2019). In order to verify the effectiveness of the calculation algorithm for generating this initial micro data, we implemented the calculation algorithm in Python and conducted verification using open data in Toyama City, Toyama Prefecture. As a result, the calculation time was about 15 minutes, and the calculation time was dramatically shortened.

Content from these authors
© 2021 Japan Society of Civil Engineers
Previous article Next article
feedback
Top