Abstract
Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident.
Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) "Challenges and countermeasures of ordering method of construction projects", to verify from the (2) "actually happened substation foundation displacement accident". And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for "construction work scope and risk control the construction project ordering institutions to implement" the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process.