Journal of Japan Society of Dam Engineers
Online ISSN : 1880-8220
Print ISSN : 0917-3145
ISSN-L : 0917-3145
Leveraging Natural Recovery in Flood Mitigation Dam : Planning and Three-year Effectiveness Verification after Trial Impounding
Maiko AKATSUKA, Nanako SUZUKI, Hiroaki MISAKA, Masahiro MORISHITA
Author information
JOURNAL RESTRICTED ACCESS

2026 Volume 36 Issue 2 Pages 161-172

Details
Abstract

To assess the effects of trial impounding on biota at a flood mitigation dam, we surveyed vegetation, fish, and amphibians from before trial impounding through three years after trial impounding, using environmental DNA (eDNA) to complement animal surveys. During construction, the clearing footprint was minimized and a pond was created to provide a waterside environment, considering environmental conservation and labor efficient maintenance. After trial impounding, vegetation succession progressed and amphibian spawning was observed, while no significant changes were detected in plant communities or in animal species detected by eDNA. Around the pond, flow action and sediment deposition during trial impounding formed diverse habitats, and germination of important species from upstream seed sources was confirmed. These results support the effectiveness of nature based measures that leverage natural recovery processes.

Content from these authors
© 2026 by Japan Society of Dam Engineers
Previous article Next article
feedback
Top