Abstract
Due to the spread of the full-layer placing method in dam construction, concrete transportation methods are diversifying. With consideration of such circumstances, a concrete transportation method has been developed newly. Compared to existing methods, it has the advantage of being more environmentally desirable in setting up. The method was evaluated quantitatively through comparison with existing methods, and its possibility was considered as a optional method.