A Scheduling Method for Painting Line under Pull Production
Jae Kyu YOOKojiro SHINBOYoshiaki SHIMIZU
著者情報
ジャーナル フリー

2003 年 46 巻 1 号 p. 88-92

詳細
抄録
This paper concerns with a scheduling method for painting (preceding) line with much longer production lead-time than assembly (subsequent) line. In general, production schedule of the painting line is made independently based on the forecasted job requirement at the assembly line. When the job requirement changes at the assembly line by virtue of the change of customer order, therefore, production balance is destroyed between the both lines. To avoid the tardiness caused by such unbalance, we need to have many inventories for the painting line. Such countermeasure is taken place in many companies actually. Thus, to avoid the tardiness while keeping small inventory, we propose a scheduling method that makes a Pseudo-Pull production possible for the painting line. We have evaluated the proposed method through computer simulations.
著者関連情報
© 2003 by The Japan Society of Mechanical Engineers
前の記事 次の記事
feedback
Top