The Proceedings of the Dynamics & Design Conference
Online ISSN : 2424-2993
2018
Session ID : 230
Conference information

Connected Control Method for Internally-Divided Single Building Coupled with Distibuted Connected Control Method
*Hidenori HIRATAKenta KAWANAKen NAGATAHiroyuki TAKAHASHIToru WATANABEKazuto SETO
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract

The connected control method (CCM) utilized reaction force between buildings as damping force by using connecting springs and dampers. Integrated connected control method (ICCM) to high-rise building split into four substructures is already presenting and its effectiveness is already confirming. Besides, Distributed CCM(DCCM) is also presented to connect buildings by using plural dampers on multiple layers in order to ease stress concentration. In this paper, to investigate the applicability of ICCM with DCCM to real buildings, experimental apparatus be modified and it is carried out precise examination, through computer simulation and experiments. As the results, the performance of ICCM with DCCM was clearly shown.

Content from these authors
© 2018 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top