設計工学・システム部門講演会講演論文集
Online ISSN : 2424-3078
セッションID: 2409
会議情報
2409 An initiative to implement lean manufacturing usng value stream mapping in textile manufacturing company
Effendi MOHAMADSiti Nur Fatihah AB RASIDTeruaki ITOMohd Amran Md AliMohd Amri SULAIMANMohd Ashadi AZAMAdi SAPTARI
著者情報
会議録・要旨集 フリー

詳細
抄録
This paper presents collaboration between a textile manufacturing company in Malaysia and Universiti Teknikal Malaysia Melaka. In this Company-University Collaboration (CUC), an engineering student was assigned with a task to implement value stream mapping (VSM) to support the implementation of Lean Manufacturing (LM) tool in the company. The task is targeted to be completed in six to nine months. In this paper, the development of current and future state map of the company is described. Identification of waste based on current state map is shown and improvement via future state map is elaborated. As a conclusion, the collaboration is proven to be feasible in supporting VSM implementation in the textile manufacturing company.
著者関連情報
© 2014 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top