抄録
The "Kokubu District Shikine Recycling Center" and "Clean Oshima" which are Pyrolysis and Melting System (Kiln type) have been completed in March, 2003. This is the test run report which started in October, 2002 in the "Kokubu District Shikine Recycling Center". We confirm the following performances of Pyrolysis and Melting System (Kiln type) through the test run (1) Performing stable operation. (2) Reducing the volume of municipal solid waste (MSW). (3) It is possible to melt ash using the energy which the MSW itself has, without using external fuel. (4) Dioxins emission can be minimized.