Proceedings of the ... International Conference on Nuclear Engineering. Book of abstracts : ICONE
Online ISSN : 2424-2934
2003
会議情報
ICONE11-36211 ADVANCED EVALUATION METHOD OF SG TSP BEC HOLE BLOCKAGE RATE
Hiroyuki IZUMIDAYasuyuki NAGATAYutaka HARADARyuji MURAKAMI
著者情報
会議録・要旨集 フリー

p. 10-

詳細
抄録
In spite of the control of the water chemistry of SG secondary feed-water in PWR-SG, SG TSP BEC holes, which are the flow path of secondary water, are often clogged. In the past, the trending of BEC hole blockage rate has conducted by evaluating ECT original signals and visual inspections. However, the ECT original signals of deposits are diversified, it becomes difficult to analyze them with the existing evaluation method using the ECT original signals. In this regard, we have developed the secondary side visual inspection system, which enables the high-accuracy evaluation of BEC hole blockage rate, and new ECT signal evaluation method.
著者関連情報
© 2003 The Japan Society of Mechanical Engineers
前の記事 次の記事
feedback
Top