Proceedings of the ... International Conference on Nuclear Engineering. Book of abstracts : ICONE
Online ISSN : 2424-2934
2023.30
セッションID: 1583
会議情報

THE I&C EQUIPMENT FOR SEVERE ACCIDENT MANAGEMENT IN KASHIWAZAKI-KARIWA NUCLEAR POWER PLANT UNITS 6 AND 7
Toru TanakaKazuhiro KoikeTakanobu SaitoTakahiro HoshinoRyohei Endo
著者情報
会議録・要旨集 認証あり

詳細
抄録

For the safety operation and cold shutdown of nuclear power plant, the I&C equipment is important to grasp the state of nuclear power plant. On March 11, 2011, at the Fukushima Daiichi nuclear accident that progressed to severe accident with core damage, many of the I&C equipment lost their functions and it was difficult to grasp the state of nuclear power plant. It is very important of measuring and grasping the parameters of nuclear power plant (e.g., RPV water level, RPV pressure) for accident management, at severe accident such as the Fukushima Daiichi nuclear accident.

In this paper, we introduce the actions for the I&C equipment for severe accident management in Kashiwazaki-Kariwa nuclear power plant units 6 and 7 (KK-6/7), based on the lessons learned from the accident.

著者関連情報
© 2023 The Japan Society of Mechanical Engineers
前の記事 次の記事
feedback
Top