抄録
The main design parameters and process diagram of the first wet limestone/gypsum FGD plant in Guangdong province are introduced, problems met in the course of operation are analyzed emphatically. Optimization of the FGD systems is researched and carried out gradually, which simplifies FGD plant and lower the cost, meanwhile safety and reliability is also improved.