2315 PBMR の経済性予備的評価 : PBMR と PWR の主要設備における単位出力あたりの建設費比較
浦上 正雄土江 保男
著者情報
会議録・要旨集 フリー

p. 389-390

詳細
抄録
The power company of South Africa (ESKOM), is reporting on the construction cost of small modular HTGR (PBMR) indicating its total amount is about 70% of the same output of U.S conventional PWR. We carried out of preliminary economic evaluation, based on the design information of PBMR that is tentatively revealed. We estimated the cost for each facilities of PBMR, in the construction unit price and, facilities constitution proportion that is supposed from recent Japanese PWR. As the result, the construction unit price regarding the civil engineering, mechanical equipment, electricity facilities of PBMR, became about 220,000 (\/kWe) and was about \60,000 (22%) cheaper than the PWR.
著者関連情報
© 2000 一般社団法人日本機械学会