抄録
Market Oriented Programming (MOP) is a kind of technique to achieve an efficient distribution of the resources by using the concept of the neo-classical economics. The scheduling model based on the MOP has been proposed and verified its efficiency under the static conditions. In this paper, we enhance our scheduling system with MOP into the dynamic situations and analyze its characteristics with computer experiments.