動力・エネルギー技術の最前線講演論文集 : シンポジウム
Online ISSN : 2424-2950
セッションID: E232
会議情報
E232 中部電力の安全対策強化の取り組み(OS8 軽水路・新型炉・原子力安全(7))
横田 政和涌永 隆夫石田 卓久安田 光博
著者情報
会議録・要旨集 フリー

詳細
抄録
As the lessons learned by the Fukushima Danchi NPP accident, Chubu Electric Power carried out emergency safety measures in Hamaoka NPP immediately and announced the plan of countermeasures for tsunamis in the NPP including the 18m-height protection wall in July 2011. Furthermore, the company announced the additional severe accident countermeasures in the NPP in December 2012, such as installation of the Filtered Containment Venting System and increasing the height of the protection wall from 18m to 22m. In this paper, we present major safety upgrading activities against tsunamis and earthquakes at the NPP.
著者関連情報
© 2013 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top