By developing a railway construction limit measurement tool using a three-dimensional shape measuring machine, we realize efficiency of operation and maintenance work. Railway construction limit control requires data of both rail measurement and railway facility object position measurement. Real time management of railway construction limit is realized by measuring and processing them at the same time.