低改良率セメントコラム工法(ALiCC工法)の施工事例について
近藤 益央宮武 裕昭大林 淳新川 直利柳浦 良行
著者情報
ジャーナル フリー

2016 年 65 巻 1 号 p. 50-55

詳細
抄録
A soil improvement of the low improved rate is effective for cost reduction of countermeasure for soft ground and shortening the construction period. Therefore we developed a new design method that could consider an arch action to occur in embankment. It is possible to evaluate embankment load carrying cement column and non-improved soft ground by the arch action. Therefore it is possible to distribute improved cement column distance bigger than a conventional construction method. It is complete and places an improved cement column under the embankment. So, it is possible to control settlement and differential settlement of the embankment, moreover it is becoming cost reduction of countermeasure for soft ground and shortening the construction period. In this report, we introduce the outline of the Arch Action Low Improvement Ratio Cement Column Method, and we clarify the effectiveness by comparing ALiCC method and conventional methods.
著者関連情報
© 2016 日本材料学会
前の記事 次の記事
feedback
Top