原位置試験による各種遮水壁の透水係数評価
中島 朋宏田屋 裕司山﨑 祐二
著者情報
ジャーナル フリー

2026 年 75 巻 1 号 p. 58-64

詳細
抄録

In the construction planning of cut-off wall, hydraulic conductivity (k) is a crucial parameter. There are various construction methods for cut-off walls, and the effectiveness is compared by k listed in the technical documentation for each method to select the most suitable method. However, these k lack clarity regarding construction conditions, ground conditions and evaluation methods, and there are very few cases where different methods have been compared at the same site. Additionally, when construction space is limited, methods are restricted to those using small machinery such as steel sheet piles, jet grouting and chemical grouting. Therefore, we constructed cut-off walls using these methods in the same ground conditions and evaluated their k. As a result, we found that some methods showed higher values than those in technical documents, some showed lower values, and some methods showed different values between in-situ tests and laboratory tests. Consequently, it is necessary to consider safety factors for k in technical documents, and field verification is deemed necessary.

著者関連情報
© 2026 日本材料学会
前の記事 次の記事
feedback
Top